Mayur Vihar UP Link Bridge

Mayur Vihar UP Link Bridge

Construction of Bridges at (UP Link) Near Mayur Vihar Phase – I, Delhi

Project Value

₹8.50

Start Year

2009-01-01

Completion

2010-12-31

Category

In-Hand

Project Description

Complete project overview and scope

Construction of Bridges at (UP Link) Near Mayur Vihar Phase – I, Delhi

This project involved construction of a bridge providing critical UP Link connectivity. The structure was designed to support high traffic volume in an urban environment. RCC works were executed with precision to ensure structural stability. Construction activities were coordinated to minimize impact on surrounding areas. Emphasis was placed on safety, quality, and timely delivery. Durable materials were used to withstand long-term traffic loads. The bridge improved traffic movement and reduced congestion in the area. The project met all applicable engineering and safety standards.

Client / Owner

Project owner and stakeholder

M/s. D.S. Construction Ltd. KM-24, Milestone, Dundeheda Delhi – Gurgaon Border Haryana

Client / Owner Feedback

Very Good work

Architect / Consultant

Owner

Project Gallery

4 images
gallery image
gallery image
gallery image
gallery image

Quality Assured

ISO 9001:2015

On-Time Delivery

100% Track Record

Expert Team

Skilled Engineers

Safety First

Zero Accidents

Landmark Project

One of our signature projects

Project Overview

Start Year

2009-01-01

End Year

2010-12-31

Project ID #231
Type
Value ₹8.50

Why Trust Our Experience

Extensive track record across in-hand projects with robust controls and reliable delivery.

Advanced planning and scheduling
Quality assurance and control
Safety-first site execution
Cost monitoring and optimization
Skilled workforce and supervision
Client communication and reporting

Expert Team